
KUNMING, June 29 (Xinhua) -- A 12-km-long tunnel on the Kunming-Vientiane Railway to link China with Laos was drilled through on Monday morning.
The Shitouzhai tunnel, located in Yutang Town, Mojiang County of southwest China's Yunnan Province, is one of the 93 tunnels along the 508 km Yuxi-Mohan section of the Kunming-Vientiane Railway. So far, 70 tunnels have been drilled through, according to the China Railway Kunming Group Co., Ltd.
Large air conditioners and ice makers have been used to help construction workers cope with the high temperature during drilling, according to Wang Li, a project manager.
The Yuxi-Mohan section in China is scheduled to be opened simultaneously with the Boten-Vientiane section in Laos by the end of 2021.
Fire brigade in Shanghai holds group wedding
Tourists enjoy ice sculptures in Datan Town, north China
Sunset scenery of Dayan Pagoda in Xi'an
Tourists have fun at scenic spot in Nanlong Town, NW China
Harbin attracts tourists by making best use of ice in winter
In pics: FIS Alpine Ski Women's World Cup Slalom
Black-necked cranes rest at reservoir in Lhunzhub County, Lhasa
China's FAST telescope will be available to foreign scientists in April
"She power" plays indispensable role in poverty alleviation
Top 10 world news events of People's Daily in 2020
Top 10 China news events of People's Daily in 2020
Top 10 media buzzwords of 2020
Year-ender:10 major tourism stories of 2020
No interference in Venezuelan issues
Biz prepares for trade spat
Broadcasting Continent
Australia wins Chinese CEOs as US loses