
URUMQI, Oct. 15 (Xinhua) -- A new ultra-high-voltage power transmission line has begun operation in northwest China's Xinjiang Uygur Autonomous Region, marking the full coverage of 750-kV power network in the region.
Following 72 hours of trial operation, the 341-km 750-kV power transmission line connecting the Altay Prefecture and the northern Junggar Basin was on Wednesday put into official operation, which will increase the prefecture's outward power transmission capacity to 2 million kW.
The Altay Prefecture is rich in solar and wind power, and it used to be difficult to generate economic revenue from excess electricity due to the region's limited exploitation and transmission capacity.
With an investment of 1.67 billion yuan (247.7 million U.S. dollars), the State Grid's Xinjiang branch started building the power transmission line in September 2018 so that the prefecture could transmit and sell some of its unused power, bringing in revenue for local development.
According to the Xinjiang branch of the State Grid, the 750-kV backbone power grid has covered all prefectures in Xinjiang, ensuring power supply for the region's development.
Fire brigade in Shanghai holds group wedding
Tourists enjoy ice sculptures in Datan Town, north China
Sunset scenery of Dayan Pagoda in Xi'an
Tourists have fun at scenic spot in Nanlong Town, NW China
Harbin attracts tourists by making best use of ice in winter
In pics: FIS Alpine Ski Women's World Cup Slalom
Black-necked cranes rest at reservoir in Lhunzhub County, Lhasa
China's FAST telescope will be available to foreign scientists in April
"She power" plays indispensable role in poverty alleviation
Top 10 world news events of People's Daily in 2020
Top 10 China news events of People's Daily in 2020
Top 10 media buzzwords of 2020
Year-ender:10 major tourism stories of 2020
No interference in Venezuelan issues
Biz prepares for trade spat
Broadcasting Continent
Australia wins Chinese CEOs as US loses